case study

Aldenham School Science Block

We were appointed to work alongside the main contractor to refurbish the entire science block

scroll down to read more

Location:
Borehamwood
Client:
Aldenham School
Timescale:
16 weeks
Value:
£90k
Sector:
Commercial

Project Details:

As part of the ongoing refurbishment and upgrade of the school’s portfolio, we were appointed to work alongside the main contractor to refurbish the entire science block.

Work included:
  • Strip out of existing installation and make safe to allow for demolition
  • Design and installation of new sub-main and distribution to all labs and general areas
  • Installation of safety stop controls for gas and electric outlets in the labs
  • Installation of intelligent lighting systems, and emergency lighting
  • Installation of entire CAT 6 data infrastructure throughout the building

Project Gallery:

Other Case Studies

Clayton Hotel, Birmingham
Clayton Hotel, Birmingham

Rolling out a new room design across 43 bedrooms

Holiday Inn, Brentwood
Holiday Inn, Brentwood

We worked with Holiday Inn to create new cohesive spaces for guests to eat, drink, work and meet.

Al Rayan Bank Head Office
Al Rayan Bank Head Office

Full refurbishment of the Bank's new Headquarters - a high-end 4 storey building in the centre of London.

Get in Touch With Us Today For A Quote

talk to us today about your Commercial, Industrial or Maintenance needs.

We are a family-run business of electrical contractors and commercial electricians based in Bedford.

Established in 2008, we have rapidy gained a first class reputation for the quality and the scope of our work.

Contact Us