case study

Aldenham School Dining Hall

We were appointed to design and install a new lighting scheme that showcased the dining rooms amazing architecture.

scroll down to read more

Location:
Borehamwood
Client:
Aldenham School
Timescale:
16 weeks
Value:
£25k
Sector:
Commercial

Project Details:

As part of the ongoing refurbishment and upgrade of the school’s portfolio, we were appointed to design and install a new lighting scheme that showcased the dining rooms amazing architecture whilst incorporating modern styling and making the room light and airy.

Work included:
  • Comprehensive design and consultation with the school to finalise the design proposals
  • Strip out of existing installation, working at a high level to allow installation of new cabling, bespoke light fittings, and small power outlets
  • The lighting control was provided via a DALI2 protocol to provide simple and intuitive lighting control to maximise the use of the venue

Project Gallery:

Other Case Studies

Clayton Hotel, Birmingham
Clayton Hotel, Birmingham

Rolling out a new room design across 43 bedrooms

University of Hertfordshire, Hatfield
University of Hertfordshire, Hatfield

We simplified existing systems and designed a solution where no re-wiring was required to minimise disruption.

Al Rayan Bank Head Office
Al Rayan Bank Head Office

Full refurbishment of the Bank's new Headquarters - a high-end 4 storey building in the centre of London.

Get in Touch With Us Today For A Quote

talk to us today about your Commercial, Industrial or Maintenance needs.

We are a family-run business of electrical contractors and commercial electricians based in Bedford.

Established in 2008, we have rapidy gained a first class reputation for the quality and the scope of our work.

Contact Us