case study

Hoar Cross Hall Hotel & Spa

Electrical works during a full equipment replacement to their existing gym space to create a new and improved layout.

scroll down to read more

Location:
Hoar Cross Hotel & Spa
Client:
Barons Eden
Timescale:
4 weeks
Value:
£16,600
Sector:
Commercial

Project Details:

Challenge / Scope

Full equipment replacement to their existing gym space creating a new and improved layout for its members.

Works Included

Our engineers installed a new sub main and distribution board to supply the new equipment, installed floor grommets to the new machines to provide power connection, digital TV signal and a Cat6 data link to the hotels main IT network. We also added new wall lights throughout the space.

Benefits to the client

As a hotel with a spa incorporated within the grounds, it’s imperative that guests have the full luxury experience when staying at Hoar Cross Hall, and having a state-of-the-art gym certainly helps them achieve this.

Project Gallery:

Other Case Studies

Aldenham School Science Block
Aldenham School Science Block

We were appointed to work alongside the main contractor to refurbish the entire science block

Sketchley Grange Hotel, Hinckley
Sketchley Grange Hotel, Hinckley

We were contracted to provide strip-out, full rewiring and many more other features needed by this amazing hotel.

Lincoln University Student Union
Lincoln University Student Union

Our experience in the hospitality sector and fast-paced projects ensured that this project was completed on time for our client.

Get in Touch With Us Today For A Quote

talk to us today about your Commercial, Industrial or Maintenance needs.

We are a family-run business of electrical contractors and commercial electricians based in Bedford.

Established in 2008, we have rapidy gained a first class reputation for the quality and the scope of our work.

Contact Us