case study

Al Rayan Bank Head Office

Full refurbishment of the Bank's new Headquarters - a high-end 4 storey building in the centre of London.

scroll down to read more

Location:
Al Rayan Bank, London
Client:
Apex Office Interiors
Timescale:
12 weeks
Value:
£120,000
Sector:
Commercial

Project Details:

Challenge / Scope

Full refurbishment works to the new HQ, a high-end 4 storey building in the centre of London for Al Rayan bank, one of the UK’s largest Islamic Banks by assets and one of the fastest growing banks in the country.

Works Included

On each level the lighting, Dali lighting control, small power and data were overhauled, altered, adapted and additional outlets installed. Supplies were also installed for AC units and blind controls. Data cabling was adjusted throughout the building with additional lines added for desk positions and AV systems.

The comms room was fully repatched and adjusted according to the IT specification.

Benefits to the client

The bank and its clientele expected high workmanship and a high standard of finish which we achieved within a tight deadline and set budget.

Project Gallery:

Other Case Studies

Wychwood Park Hotel, Crewe
Wychwood Park Hotel, Crewe

We were involved in two phases of refurbishment at the Wychwood hotel. The first was 110 bedrooms and the second included the public areas.

The Woburn Hotel and Restaurant, Woburn
The Woburn Hotel and Restaurant, Woburn

Allen and Son designed, managed and installed the complete electrical installation.

Enfield Golf Club
Enfield Golf Club

We implemented a full refurbishment of the clubhouse including the bars, public areas, restaurants, lounges, and WC's.

Get in Touch With Us Today For A Quote

talk to us today about your Commercial, Industrial or Maintenance needs.

We are a family-run business of electrical contractors and commercial electricians based in Bedford.

Established in 2008, we have rapidy gained a first class reputation for the quality and the scope of our work.

Contact Us