case study

Aldenham School Science Block

We were appointed to work alongside the main contractor to refurbish the entire science block

scroll down to read more

Location:
Borehamwood
Client:
Aldenham School
Timescale:
16 weeks
Value:
£90k
Sector:
Commercial

Project Details:

As part of the ongoing refurbishment and upgrade of the school’s portfolio, we were appointed to work alongside the main contractor to refurbish the entire science block.

Work included:
  • Strip out of existing installation and make safe to allow for demolition
  • Design and installation of new sub-main and distribution to all labs and general areas
  • Installation of safety stop controls for gas and electric outlets in the labs
  • Installation of intelligent lighting systems, and emergency lighting
  • Installation of entire CAT 6 data infrastructure throughout the building

Project Gallery:

Other Case Studies

Woodbridge Golf Club, Suffolk
Woodbridge Golf Club, Suffolk

Trade area and kitchen refurbishment

University of Hertfordshire, Hatfield
University of Hertfordshire, Hatfield

We simplified existing systems and designed a solution where no re-wiring was required to minimise disruption.

Al Rayan Bank, London
Al Rayan Bank, London

Conversion of the basement into an open-plan office

Get in Touch With Us Today For A Quote

talk to us today about your Commercial, Industrial or Maintenance needs.

We are a family-run business of electrical contractors and commercial electricians based in Bedford.

Established in 2008, we have rapidy gained a first class reputation for the quality and the scope of our work.

Contact Us